Providing the best thermal comfort conditions and at the same time reducing operational costs of each building was my biggest motivation for acquiring technical knowledge and experience with the below indicative projects to be an example of my work :
Project : Heat Recovery VRF systems for KAIZEN company LEED GOLD offices
Objectives :
- Heat Recovery VRF systems
- Unified control systems
- Sustainable HVAC system for LEED GOLD certification

______________________________________________________________________________________________
Project : Hydronic system with inverter chillers for Piraeus Tower
Objectives :
- Full-Inverter chillers
- Independent function of each chiller either for hot or cold water (4-pipe design)
- Unified Control System

______________________________________________________________________________________________
Project : Heating, Ventilation and Air-Conditioning systems design and installations for the first passive house in Southeastern Mediterranean
Objectives :
- Under floor heating and cooling system for thermal comfort
- Solar thermal system of 27m2 collector surface with high efficiency ΚΒΒ collectors for heating and hot water production.
- Two DAIKIN inverter heat pumps of 8kw each as a backup system
- Ventilation system with LUFTA heat exchanger for clean indoor environment and energy efficiency

______________________________________________________________________________________________
Project : Heating, Ventilation and Air-Conditioning systems rennovation for the Fraport’s 14 regional Greek airports
Objectives :
- Replace 45 air-cooled chillers and heat pumps of total capacity 22,5 MW
- Provide cooling heating and hot water fro energy recovery system
- Sequencing units for energy upgrade and running cost reduction
- Remote monitoring systems for preventive maintenance and optimization

______________________________________________________________________________________________
Project : Heating, Ventilation and Air-Conditioning systems for the Piraeus Port Plaza buildings
Objectives :
- Design and install 9 Air Handling Units of total airflow over 300.000 m3/h
- Provide high efficieny energy recovery systems
- Ensure the best Indoor Air Quality
- Remote monitoring systems for preventive maintenance and optimization

______________________________________________________________________________________________
Project : Heating, Ventilation and Air-Conditioning systems for the Golden Hall Mall
Objectives :
- Design and install 12 Air Handling Units of total airflow over 400.000 m3/h
- Provide high efficieny energy recovery systems
- Ensure the best Indoor Air Quality
- Remote monitoring systems for preventive maintenance and optimization

______________________________________________________________________________________________
Project : Process cooling system ELBISCO factory in Chalkis
Objectives :
- Design and install 1 Air Handling Unit and 2 screw inverter chillers
- Provide high efficieny and partial load coverage through inverter technology
- Ensure the uninterrupted cooling for the production process of the food factory
- Remote monitoring systems for preventive maintenance and optimization

______________________________________________________________________________________________
Project : Heating, Ventilation and Air-Conditioning systems for the COSMOTE TV Headquarters and Studios
Objectives :
- Design and install 6 Air Handling Units of total airflow over 300.000 m3/h
- Design and install 3 top efficiency Air cooled heat pumps of total capacity 500 KW
- Provide high efficieny thermal comofrt conditions
- Ensure the best Indoor Air Quality
- Respect the sensitive sound pressure requirements

______________________________________________________________________________________________
Project : Heating, Ventilation and Air-Conditioning systems for the LYTTOS MARE Hotel in Crete
Objectives :
- Design and install 4 top efficiency water cooled heat pumps of total capacity 2200 KW
- Provide high efficieny thermal comofrt conditions for hotel spaces
- Ensure the proper hot water for baths, kitchens and pools
- Respect the sensitive sound pressure requirements